Week of April 1st

 MEDIA BLASTING

Front Beam Chassis Chassis3
Pre Blasted Chassis
Tom Sand Blasting Sand Blasted Chassis Sand Blasted Front Backing Plate Sand Blasted Front Beam

TRANSMISSION SENT TO
LEE MYLES IN HICKSVILLE

Transmission Lee Myles

SHIFT BRACKET
This is a precautionary measure that I recommend for every VW restoration.

Tools Spot Weld Bit Spot Welds Are Easily Located Center Punch and Drill Welds
After Drilling New Bracket Welded In
Old Bracket on Left, New on Right New Bracket Bolted In
Back View
Grinding Welds Completed

  PREPARING FOR REPAIRS

Removing Damaged Segment Bulk Head Wall Removed With Plasma Cutter

  LET THE REPAIRS BEGIN

2 X 2  1/8" Angle Steel Tunnel Segment Removed Tack In Place Completed Weld
Both Sides Replaced, Plumbing Done
Trimming Excess Angle Clean and Completed

  CLOSING TUNNEL

Rear 18 GaugeTin Cut For Lower Tunnel Layout of Tunnel Tin
Chassis must be level.
Arc Test Fit Crimping and Welding in Place
After Fabricating Lower Tunnel It Must Be Arced
Tunnel Wall

www.tjkustoms.com
Tj Kustoms @516-338-8746

[What We Offer] [Specials] [Contact Us] [What's In a Name] [Buggy Project] [Week of April 1st ] [Week of April 8th] [Week of April 15th] [Week of April 22nd] [April 22nd Part II] [May] [June's First Weeks] [The Build] [Buggy Manuals] [Original Interiors] [Custom Interiors] [Restorations] [Dune Buggy Items] [Our Mission]